Wednesday, January 26, 2011

Nan Ning Sanzong business land cut card limit housing to be built

 Yesterday morning, Nanning City Land Resources Bureau welcomed the trading floor cut the last time before Chinese New Year cards, three card cut smoothly operating sites, with a total area of 245.7 acres of turnover, total turnover of 279.2 million yuan. Among them, in order to limit the form of transfer of the Housing Yong Wu Road, east of GC2010-100 block, after 20 rounds of bidding, the era of the Guangxi Ruijing total turnover of Real Estate Development Co., Ltd. to 1804.1997 million won.

day of transfer of land, a total of five, including three business land for urban residential land and the wholesale and retail land, located east of Yong-Wu Road, five as the road south and extend the line south of University Avenue.

10:00 into the cut-off licensing process, the first transfer is the Yong Wu Road, east of GC2010-100 block. The land covers an area of 14.668 acres, the project home sales price for the 2,745 yuan up / sq m, sold in western Guangxi autonomous region is limited to the housing difficulties of Highway Authority employees, and the workers should have After 20 rounds of bidding, the era of the land by the Guangxi Ruijing Real Estate Development Company to 1.23 million transaction price / acre, floor price 410 yuan / square meter, total turnover 1804.1997 million won.

subsequent extension of the five lines as road blocks south of GC2010-126 cut-off card. Although there are two companies offer advice but the scene when the two companies do not want to bid, and ultimately the land was the highest offer of 82 Ningliang Feng River National Forest Park in the south to beyond the initial listing price of 10,000 yuan / mu prices won. Price of 260 yuan / mu, total turnover for the 25985.7780 million.

third block is located in the cut-off licensing the south side of University Road No. wuliting GC2010-056 change for the project, covers an area of 147.655 acres. The total land to be demolition sites, the total land and land within the land, underground buildings (structures) required by the buyer can carry out the demolition, and bear all costs of removal and resettlement compensation. Only 88 bidders site Nanning Real Estate Development Co., Ltd Han and quoted a total price of 131.1065 million turnover.

found that the industry carefully, three plots of the transfer conditions more humane. Site to watch the cut-off license plate industry, said Mr Yong Wu Road, east of GC2010-100 block, in order to transfer the form of housing price, housing sales targets and limits the maximum sales price, not only solve the housing problems of needy families, but also housing prices rose too fast. The other two plots of the People First approach is to require public facilities built with with build schools. If wuliting twelve Street Urban Renewal Area project site (GC2010-056 block) requires construction of 24 classes in primary schools with a land area of not less than 12,000 square meters, building area of not less than 6048 square meters; 18 classes Kindergarten 1, floor area of not less than 3780 square meters. Five extension cord as the road block south of GC2010-126 also required with construction, with construction of primary schools (18 classes) a primary independent land area of not less than 10,000 square meters, building area of not less than 5,000 square meters.

industry analysis, before the transfer of a number of small plots, but did not complete the construction into the public schools. Now with such a mandatory built in the housing package and obviously more humane. (Intern reporter Shi Xiaohui Chen Yang)

No comments:

Post a Comment